• /
  • /
Cooling Systems for MRI
WAVE has been engaged in the design, supply, installation, and maintenance of reliable and highly efficient cooling systems for MRI and other facilities since 2014.
About us
We use advanced equipment from the best manufacturers in the world — CAREL, TICA, BlueBox, and DANTEX. This equipment undergoes rigorous testing to ensure it meets all standards.
MRI climate system structure
Installation and commissioning
10-12 days
Complete set of the climate system
6-8 weeks
This system is designed to provide users with cold water or a non-freezing cooling fluid from a refrigeration source.
Cooling system
The MRI climate system
It is used to accurately control the temperature and humidity levels in the MRI scanning and technical areas.

The ventilation and air conditioning systems employ only modern, reliable, and energy-efficient equipment.
Ventilation and air conditioning systems
Installation and commissioning
10-12 days
Complete set of the climate system
6-8 weeks
The MRI climate system
Includes:

  • Gas analyzer (for monitoring oxygen levels in the treatment room)
  • Modules and leakage sensors
  • Coolant pressure switch
  • Alarm panel in the operator’s room

Supplies of an integrated electrical shield for the entire climate system.
Automation and emergency warning systems
Installation and commissioning
10-12 days
Complete set of the climate system
6-8 weeks
The MRI climate system
Allows remote monitoring and control of the climate system via any mobile device:

  • Turning on/off the equipment
  • Viewing and resetting crashes
  • Control and adjustment of operating parameters: temperature, air humidity, coolant temperature, and power supply voltage.
Dispatching and monitoring system
Installation and commissioning
10-12 days
Complete set of the climate system
6-8 weeks
The MRI climate system
Chiller
Tank
Fancoil
Humidifier
Ventilation
Pumps
Components
All components of the climate system are selected in accordance with the technical specifications and full compliance with current regulatory requirements.
Chiller
Humidifier
Tank
Fancoil
Ventilation
Pumps
Chiller
Humidifier
Tank
Fancoil
Ventilation installation
Pumps
Stages of work
Project
All design solutions are created using BIM technology.
Stage I
Equipment
Preparation of equipment, materials, and components.
Stage II
Mounting
Installation is carried out by professional technicians with extensive experience in installing climate systems.
Stage III
Project
All design solutions are created using BIM technology.
Equipment
Preparation of equipment, materials, and components.
Mounting
Installation is carried out by professional technicians with extensive experience in installing climate systems.
Stage I
Stage II
Stage III
Implemented projects
Find out the cost of implementing your project
Leave a request, and we will contact you
years in the industry
10
projects
500+
We provide a wide range of services and ensure our clients receive the best results, full compliance with building code standards and regulations, as well as efficiency, high productivity, and cost-effectiveness of the equipment used in climate control systems.
They work with us